Regulationhistorical
49 CFR 193.2141
Electrical systems.
Current as of 1999-10-01 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source (a) Each operator shall select and install electrical equipment and wiring for components in accordance with ANSI/NFPA 70 and, where applicable, section 7-6.2 of ANSI/NFPA 59A.
(b) Electrical grounding and bonding must be in accordance with section 7-7.1.1 of ANSI/NFPA 59A.
(c) Protective measures for stray or impressed currents must be provided in accordance with section 7-7.3 of ANSI/NFPA 59A.
[58 FR 14522, Mar. 18, 1993]