Regulationhistorical
49 CFR 193.2325
Testing control systems.
Current as of 1999-10-01 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source Each control system must be tested before being placed in service to assure that it has been installed properly and will function as required by this part.