49 CFR 194.7
Operating restrictions and interim operating authorization.
(a)An operator of a pipeline for which a response plan is required under § 194.101, may not handle, store, or transport oil in that pipeline unless the operator has submitted a response plan meeting the requirements of this part.#
(b)An operator must operate its onshore pipeline facilities in accordance with the applicable response plan.#
(c)The operator of a pipeline line section described in § 194.103(c), may continue to operate the pipeline for two years after the date of submission of a response plan, pending approval or disapproval of that plan, only if the operator has submitted the certification required by § 194.119(e).#