Regulationhistorical
49 CFR 195.124
Closures.
Snapshot 2022-10-01 Government source
eCFR editorial compilationAuthoritative but unofficial
View source Each closure to be installed in a pipeline system must comply with the 2007 ASME Boiler and Pressure Vessel Code (BPVC) (Section VIII, Division 1) (incorporated by reference, see § 195.3) and must have pressure and temperature ratings at least equal to those of the pipe to which the closure is attached.
[Amdt. 195-99, 80 FR 186, Jan. 5, 2015]