Regulationcurrent
33 CFR 154.107
Alternatives.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
View source (a)The COTP may consider and approve alternative procedures, methods, or equipment standards to be used by a facility operator in lieu of any requirement in this part if:#
(1)Compliance with the requirement is economically or physically impractical;#
(2)The alternative provides an equivalent level of safety and protection from pollution by oil or hazardous material, which is documented in the request; and#
(3)The facility operator submits a written request for the alternative.#
(b)The COTP takes final approval or disapproval action on the request, submitted in accordance with paragraph (a) of this section, in writing within 30 days of receipt of the request.#