Subpart A—General7Subpart B—Operations Manual4Subpart C—Equipment Requirements10Subpart D—Facility Operations6Subpart F—Response Plans for Oil Facilities22Subpart G—Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility Operating in Prince William Sound, Alaska7Subpart H—Response Plans for Animal Fats and Vegetable Oils Facilities6Subpart I—Response Plans for Other Non-Petroleum Oil Facilities3Subpart P—Marine Vapor Control Systems35
Regulationcurrent
33 CFR 154.540
Discharge removal.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
Each facility to which this part applies must have a means to safely remove discharged oil or hazardous material, within one hour of completion of the transfer, from the containment required by § 154.530 of this part without discharging the oil or hazardous material into the water.#