Regulationcurrent
16 NYCRR 255.1009
255.1009 Required report when compression couplings fail.
Current as of source date Government source
New York State Public Service CommissionOfficial agency material
View source (a)Except as provided in subdivision (b) of this section, each operator of a distribution pipeline system must submit a report on each mechanical fitting failure, excluding any failure that results only in a nonhazardous leak, on a Department of Transportation form PHMSA F-7100.1-2. The report(s) must be submitted in accordance with 49 CFR 191.12.#
(b)The mechanical fitting failure reporting requirements in subdivision (a) of this section do not apply to the following:#
(1)master meter operators;#
(2)small LPG operator as defined in section 255.1001 of this Part; or#
(3)LNG facilities.#