(a)For pipelines exposed to stray currents, you must have a program to identify, test for, and minimize the detrimental effects of such currents.#
(b)You must design and install each impressed current or galvanic anode system to minimize any adverse effects on existing adjacent metallic structures.#
PHMSA HL.2022.01
2022 Hazardous Liquid IA Question Set
TD.CPMONITOR.INTFRCURRENT.P — 195.577(a), 195.577(b) (+2 more questions) · examined by inspection