Regulationcurrent
HAR 6-77-135
HAR 6-77-135 Internal corrosion control: monitoring
Current as of 1994-09-03 Government source
Hawaii Public Utilities CommissionOfficial agency material
View source coupons or other suitable means must be used to determine the effectiveness of the steps taken to minimize internal corrosion. Each coupon or other means of monitoring internal corrosion must be checked two times each calendar year, but with intervals not exceeding seven and one-half months. [Eff ] (Auth: HRS '269-6) (Imp: 49#