RCSA § 16-280b-B29
Inspection and testing of Gate Stations and District
Regulator Stations#
(a)Each Operator shall ensure that inspections conducted pursuant to 49 CFR 192.739(a), as amended from time to time, include a test of the regulating equipment to ensure that it is capable of completely stopping the flow of Gas.#
(b)Gate Stations and District Regulator Stations shall be inspected at least once each calendar month, but at intervals not exceeding 45 calendar days, to determine that there is no Gas leakage in the station and the equipment is operating correctly.#
(c)Any inspection conducted pursuant to subsection (b) of this section shall not be required at a District Regulator Station if equipped with Telemetry Equipment that includes:#
(1)outlet temperature, if a heater is utilized;#
(2)odorizer operation, if applicable;#
(3)water level;#
(4)Gas detection; and#
(5)intrusion detection.#