LAC 43:XIII §2709
Change in Class Location: Required Study [49 CFR 192.609]
(A)A. Whenever an increase in population density indicates a change in class location for a segment of an existing steel pipeline operating at a hoop stress that is more than 40 percent of SMYS, or indicates that the hoop stress corresponding to the established maximum allowable operating pressure for a segment of existing pipeline is not commensurate with the present class location, the operator shall immediately make a study to determine: [49 CFR 192.609]#
(1)1. the present class location for the segment involved; [49 CFR 192.609(a)]#
(2)2. the design, construction, and testing procedures followed in the original construction, and a comparison of these procedures with those required for the present class location by the applicable provisions of this Subpart; [49 CFR 192.609(b)]#
(3)3. the physical condition of the segment to the extent it can be ascertained from available records; [49 CFR 192.609(c)]#
(4)4. the operating and maintenance history of the segment; [49 CFR 192.609(d)]#
(5)5. the maximum actual operating pressure and the corresponding operating hoop stress, taking pressure gradient into account, for the segment of pipeline involved; and [49 CFR 192.609(e)]#
(6)6. the actual area affected by the population density increase, and physical barriers or other factors which may limit further expansion of the more densely populated area. [49 CFR 192.609(f)]#
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.#
HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:240 (April 1983), amended LR 10:532 (July 1984), LR 30:1261 (June 2004).#